I've explained this before Derek. From a friend working for a firm who is responsible for lots of services  , not Auldyn etc , while they had a concept plan from day one ie what the finished job would

It's not Harmer's direct fault. Nor any of those we elect. APART from not having the departmental and relevant experience and balls to stand up to and question the reams of bullshitters and chanc

But the problem isn't the horse trams.  It's the corporate culture of the Manx civil service.  Rather than accept the reality of what their main job is, which is maintain existing structures in the mo

Posted Images

7 hours ago, foxdaleliberationfront said:

This would tie in with the rumour that the Loch Promenade tracks have been scrapped altogether to save some money. Makes sense. 

they should carry that logic all the way to strathallan

  • Like 3
Link to post
Share on other sites
7 hours ago, foxdaleliberationfront said:

This would tie in with the rumour that the Loch Promenade tracks have been scrapped altogether to save some money. Makes sense. 

Logic.

 

will believe it when I see it. Too much face to be lost to go that route 

  • Like 3
  • Sad 1
Link to post
Share on other sites
8 hours ago, foxdaleliberationfront said:

This would tie in with the rumour that the Loch Promenade tracks have been scrapped altogether to save some money. Makes sense. 

You make a very good point. There is a partial correlation between the sections that are missing from the schedule, and the so-called tramway corridor, on Loch Prom. However, they will need to go back to Planning, if they want to make such a significant change on that part of the route.

  • Like 1
Link to post
Share on other sites
1 hour ago, Nellie said:

However, they will need to go back to Planning, if they want to make such a significant change on that part of the route.

I think you're right, however it might be easier to just crack on with the road/highway bit, get it done and then go to planning.

I would guess the public and local businesses would strongly support losing the so-called Tramway corridor and replacing it with more parking - equal to what was there previously. 

It would also help subvert the noisy minority who claim to want to keep the horse trams and seem to hold sway over the entire Promenade scheme. 

Link to post
Share on other sites
9 hours ago, foxdaleliberationfront said:

This would tie in with the rumour that the Loch Promenade tracks have been scrapped altogether to save some money. Makes sense. 

Why is only Loch Promenade single track and the rest two?

A simple question to which apparently there is no answer.

No need whatsoever for two tracks. A passing place at most- a kind of mini terminus outside the Villa or where ever - but no need for two tracks.

  • Like 4
Link to post
Share on other sites
13 minutes ago, gettafa said:

Why is only Loch Promenade single track and the rest two?

A simple question to which apparently there is no answer.

No need whatsoever for two tracks. A passing place at most- a kind of mini terminus outside the Villa or where ever - but no need for two tracks.

It's a very good question and I'm sure it will have been asked of DOI countless times. But as always where the toy trains and trams are concerned they ride roughshod over any opposition or accountability 

Link to post
Share on other sites

The road is not wide enough on loch prom to have the increased track seperation that is  necessary to run motorised trams and leave suitable room for normal road vehicles.

  • Thanks 1
Link to post
Share on other sites
28 minutes ago, WTF said:

The road is not wide enough on loch prom to have the increased track seperation that is  necessary to run motorised trams and leave suitable room for normal road vehicles.

Thank you wtf

So the road is wide enough Harris and Queens Prom to take a double tram track. But why waste that space on two tracks when one would be more than enough? That space could be used for parking and/or ease traffic flow.

  • Like 1
  • Thanks 1
Link to post
Share on other sites

My reply was only a guess but it makes sense to keep the diagonal parking near the shops.   Why keep 2 tracks though instead of 1 track and passing places is a mystery.

  • Like 1
Link to post
Share on other sites
11 minutes ago, Dave Hedgehog said:

They originally wanted a single trach with passing places all the way along but it was rejected in planning after a bunch of cyclists objected. 

But that was on the sea side of the prom IIRC  not the middle of the road.

  • Like 1
  • Thanks 1
Link to post
Share on other sites

Cyclists and walkers did not want the Horse Tram on the walkway. I appreciate that.

For the Promenade horse tramway I would even suggest that a passing place is not an absolute necessity, but at a push maybe one somewhere midway eg. outside The Sefton/Villa Marina where it could be a bit of a feature. 

 

 

 

 

 

Link to post
Share on other sites
  • slinkydevil changed the title to Promenade - Megathread

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    No registered users viewing this page.


×
×
  • Create New...