1 minute ago, Neil Down said:

It would certainly not be cheap but I doubt it would be “hundreds of millions”

It is costing £20m to rebuild less than two miles of road on the prom. Imagine the costs on 25ish miles of railway track including the odd bridge or two. Under the management of the DOI. Hundreds of millions is being generous.

  • Like 1

Share this post


Link to post
Share on other sites
Posted (edited)
12 minutes ago, TheTeapot said:

It is costing £20m to rebuild less than two miles of road on the prom. Imagine the costs on 25ish miles of railway track including the odd bridge or two. Under the management of the DOI. Hundreds of millions is being generous.

Doesn’t that £20m factor in multiple laying tarmac and digging back up again just because some fucknugget wants the horse trams running

 

ETA - If you let the Dept of Idiots have anything to do with it then you would still be way out. Figure would be nearer the billion mark

Edited by Neil Down

Share this post


Link to post
Share on other sites
Posted (edited)

We do like extremes around here don't we? We've got one geezer who wants to scrap everything that is extant now and others who want to reinstate the north and west lines. Foxdale anyone?

Edited by woolley

Share this post


Link to post
Share on other sites
2 minutes ago, woolley said:

We do like extremes around here don't we? We've got one geezer who wants to scrap everything that is extant now and others who want to reinstate the north and west lines. Foxdale anyone?

The impossible dream...

Share this post


Link to post
Share on other sites
1 hour ago, Neil Down said:

The impossible dream...

A bridge too far

Share this post


Link to post
Share on other sites
Just now, dilligaf said:

A bridge too far

Gives us something to talk about on a Saturday night when telly is shite...

  • Like 1
  • Haha 1

Share this post


Link to post
Share on other sites
1 hour ago, woolley said:

I get the appeal of hospital equipment of course. Who wouldn't?

We should only buy heritage hospital equipment, buy up all the old stuff no one wants (for a pretty penny mind),  then run the hospital as an extra attraction for old paedos should they get over excited by the horse trams,  choo choo trains and fat old mean in leather.

  • Like 1

Share this post


Link to post
Share on other sites
1 hour ago, CharlieBrown said:

We should only buy heritage hospital equipment, buy up all the old stuff no one wants (for a pretty penny mind),  then run the hospital as an extra attraction for old paedos should they get over excited by the horse trams,  choo choo trains and fat old mean in leather.

You are top of the list then

Share this post


Link to post
Share on other sites
54 minutes ago, dilligaf said:

You are top of the list then

It’ll be the only name on the list”

Share this post


Link to post
Share on other sites
7 hours ago, TheTeapot said:

It is costing £20m to rebuild less than two miles of road on the prom. Imagine the costs on 25ish miles of railway track including the odd bridge or two. Under the management of the DOI. Hundreds of millions is being generous.

I agree we would be looking at hundreds of millions in that scenario easily. 

Share this post


Link to post
Share on other sites
Posted (edited)
50 minutes ago, thesultanofsheight said:

I agree we would be looking at hundreds of millions in that scenario easily. 

At least loose chippings wouldn't be a problem :D

Edited by asitis
  • Haha 1

Share this post


Link to post
Share on other sites

Just a quick one, can someone check the railway timetable on their phone because on my phone the timetables “don’t fit” the screen. So I get half a timetable!

Share this post


Link to post
Share on other sites
10 hours ago, dilligaf said:

You are top of the list then

You trying to give me a reference? I am quite tasty at pool mind.

Share this post


Link to post
Share on other sites
11 hours ago, TheTeapot said:

It is costing £20m to rebuild less than two miles of road on the prom. Imagine the costs on 25ish miles of railway track including the odd bridge or two. Under the management of the DOI. Hundreds of millions is being generous.

I think it was quoted as being £2M per mile when it was previously discussed somewhere. I don't know if that included infrastructure such as bridges though. Then you've got the upkeep after the build. 15 miles-ish Ramsey to Peel, then another 10 miles-ish Peel to Douglas.

How far is the existing Douglas to PE stretch that loses Lord knows how much each year?

Share this post


Link to post
Share on other sites

Bad enough how much was paid to Liverpool Council for these rails they decided not to use after a future tram service was scrapped, strange how other buyers of the rest of the track purchased it much cheaper?

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...

  • Recently Browsing   0 members

    No registered users viewing this page.

×
×
  • Create New...