-
Posts
28 -
Joined
-
Last visited
Content Type
Gallery
Profiles
Forums
Events
Blogs
Store
Posts posted by Doctor Kenneth Noisewater
-
-
3 hours ago, Dirty Buggane said:
Turbines have been fucked for years, this is from a former maintainaence engineer, I know I know pie chart tells a different story. Do you believe every thing government prints/puts online. Also turbines built before rest of plant was constructed around them, so to replace very difficult without removing building.
You are talking out of your dirty buggane. Firstly there is only 1 turbine at the EfW. Secondly the steam turbine is relatively small. Thirdly the turbine hall is serviced by a 10 tonne overhead crane. No part of the steam turbine weighs more than 10 tonnes. The heaviest component is the generator, and this has been craned out and shipped away for routine overhaul on at least 2 occasions.
-
1
-
-
Hello,
I've used Google Podcasts for ages. Google are soon to stop this app, putting podcasts on YouTube Music. When I try to use YouTube Music, there is no content, showing a message "Music streaming isn't available yet in this country". I had issues with Google Play on the IOM many years ago, which seemed to resolve itself.
Can anybody confirm if they are able to use YouTube Music on the IOM?
Thanks in advance
Dr K
-
Just got an email from Barclaycard saying they're closing the account as I don't have a UK address. Another card bites the dust
-
1
-
-
Wrong sub-forum - automatic 24hr ban. Sorry John, rules are rules.
-
24 minutes ago, Roger Mexico said:
As to the incinerator I'm not sure that it is producing any 'Energy from Waste' at all at the moment, or ever will again.
Can you tell us more please?
-
Well done to all involved! Listened on the radio - well played. Thanks to all who has supported this project.
-
On what road was this hole being dug? If you let me know I'll look into it.
-
2
-
2
-
Windfarm could cost up to £40 million
in Local News
Posted
Electricity generated does not have to go back to the power stations, just to one of the primary substations, in this case castle town would be most likely. Wind turbine generators will generate at HV and fed into the HV distribution system
https://www.manxutilities.im/about-us/our-assets/electricity/