Still seem hell bent on building a 1.2m wall the length of the promenade but have done nothing to manage the beach level to where it was, or looked at reintroducing groynes to reduce longshore drift.
What’s going to happen when the beach level reaches halfway up the new wall, are they going to add another 1.2m on top? 🤷♂️